Assessments of Costs and Risks of Investment


  • Project Cost Estimates (depending on the Project Phase):
    • High Level Cost Estimate (Greenfield, Concept Design)
    • Order of Magnitude Estimate (Schematic Design)
    • Pre-Tender Cost Estimate (Detailed Design)
  • Custom-tailored Cost Estimates
    • Budgeting
    • Various Cost Estimates during Construction phase (Variation Order Requests, Change Estimates, etc.)
    • Cost Estimate of remedial works / Cost Estimate for extension of building / change of use, etc.
    • CAPEX / OPEX
  • Risk Assessments
    • Assessment of Time, Quality, Cost, Permitting risks
    • Preparation of “Red Flag Reports”.

Feasibility Study

We perform a Feasibility Study in the respect of High Level Cost Estimate and Estimate of profit (based on Residual method).

                    

High Level Cost Estimate includes:


  • Project Summary;
  • Estimate of Pre-Contract Costs:
    • Design
    • Design Management
    • Land Agency fee
    • Legal and tax advisory
    • Tender Procedure
    • Sales / marketing costs
  • Estimate of Contract Costs:
    • Statutory Site Supervision
    • Project Management
    • Construction costs as per m2 of gross area
    • Utility connection charges
    • Technical acceptance procedure / Use permit
  • Estimate of Contingencies;
  • Estimate of Profit (Residual Method).

Design Management

                

  • Design Brief Preparation
    • Crafting comprehensive design briefs to capture project requirements and expectations;
  • Designer Selection Support
    • Assisting in the selection process to find the most suitable designer for your project;
  • Design Submission Review
    • Conducting thorough checks of design submissions to ensure they meet all specified criteria.

Tender Procedure Organisation

  • Preparation of tender documentation / recommendation of contracting model;
  • Recommendation of contracting companies; invitation to tender;
  • Analysis of offers, negotiating with contractors;
  • Recommendation (tender report).